Frequently Asked Questions

  • It’s as simple as calling our office to request a quote! (907-262-1609) We’ll go over the details of the job, timeline, and any other pertinent information.

  • We ask for approximately one day for deliveries up to 100 yards and 2-5 days for deliveries over 100 yards.

  • Deliveries are typically available until 7pm.

  • No you don’t! If you’re not home, we ask that you mark the location for the driver. The preferred method of marking is with buckets, cones or spray paint.

  • 10 yards for gravel products. 12 yards for screened topsoil.

  • Yes, we take Visa & Mastercard.

  • Pit run gravel is mined directly out of the pit wall. It is not processed or refined any way. It is perfect for road building.

  • Typar is a name brand of a geotextile fabric. There are many other companies that produce “road fabric”. Geotextile fabrics are used to separate the dirt from the gravel and adds structural strength to the gravel over soft ground.

Which Material Is Right for me?

Use case dictates the type of material used. Here is a short guide with visuals to help you choose the right one.

How Much Does 10 Yards Of Pit Run Gravel Cost?

Our deliveries are categorized by green, yellow and red zones. Red being the farthest away from the material source.

How do I know which delivery zone I’m in?

For each type of material we offer we also have a respective zone map. Please note: Due to multiple pit locations and material availability, the zones vary per material type.

How mUch Area Does 10 Yards of material Cover?

10ft x 24ft x 1ft thick of gravel will equal 10 yards. Calculate by multiplying 10x21x1=240/27=8.88 yards then multiply by 1.12 for compaction = 9.95 yards. Topsoil’s multiplier is much higher due to it being fluffy dirt. Try using a multiplier of 1.30.